Wednesday, May 19, 2010

New Flooring - Day 7

Quick update... We actually started laying down the planks tonight and got 3 or 4 rows in.  Some of them aren't lining up very well and I'm getting tired so I'll resume tomorrow.

I also got a call from Lowes that my other 32 boxes of planks plus the stair nosing came in.  I went up to pick that up today so now I have two big stacks of flooring in my living room waiting to be installed.

Dang... The sump pump is kicking on 2 or 3 times a minute!  I LOVE IT!  I better get to bed while it's pouring... I sleep better that way.

No comments:

Post a Comment